HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 710     Entry time: Fri Mar 10 09:34:09 2023
 Author: IC, VM, ND, VK 
 Status: New Solution 
 Type: Shift summary 
 Category: Ring 
 Important:
 Subject: Prise de donnee 10/3/2023 
 Icon:  

9h20 Start modulator, cycle magnets

10h20 Intevention Vincent sur PA

10h40 Scan charge phase

12:00 Tentative demarrage cavite

16h00 Diagnostics switched to 1Hz . We returnd to 10 Hz few moments later.

Mohamed turned Cavity to automatic tuning. RF Amplitude 40 kV . Beam is stored.

Understanding of settings of LIbera with N. Hubert.

Tune measurements with excitation coming from extraction kicker (780V),  images below.

First time horizontal tune is measured (0.36-0.37) , and is close to the model one. Data stored for postprocessing.

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: health_check_2023_03_10_10_41.png  15 kB  Uploaded Fri Mar 10 10:41:50 2023  | Hide | Hide all | Show all
health_check_2023_03_10_10_41.png
Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_40_59.png  49 kB  Uploaded Fri Mar 10 10:41:56 2023  | Hide | Hide all | Show all
scan_charge_phase_min_0.0_max_360.0_10_40_59.png
Attachment 3: scan_charge_phase_min_80.0_max_120.0_10_41_43.png  37 kB  Uploaded Fri Mar 10 10:42:00 2023  | Show | Hide all | Show all
Attachment 4: ring_vars_2023_03_10_13_38.png  26 kB  Uploaded Fri Mar 10 13:38:43 2023  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2023-03-10_12-07-34.png  113 kB  Uploaded Fri Mar 10 17:46:49 2023  | Show | Hide all | Show all
Attachment 6: Screenshot_from_2023-03-10_15-22-27.png  38 kB  Uploaded Fri Mar 10 17:47:11 2023  | Hide | Hide all | Show all
Screenshot_from_2023-03-10_15-22-27.png
Attachment 7: Screenshot_from_2023-03-10_15-42-05.png  44 kB  Uploaded Fri Mar 10 17:49:30 2023  | Hide | Hide all | Show all
Screenshot_from_2023-03-10_15-42-05.png
ELOG V3.1.4-395e101