9h22 mise en chauffe
Pb site elog; autres sites web OK
Health check OK
10:00 Cyclage aimants 0K
10:59 Demarrage
12:00 Emittance scan
Transport beam through TL. Attenuator 1.6dB. Check that beam is similar in simulation and on the screens.
Beam image at each screen station for current transport (images to attach).
Transport till ring with nominal TL optics. All charge is transported.
Check dispersion to be nonzero for later compensation in dpi and septum.
TL QP5 changed to from 2.2 to 1.5. Impoved injection stability, this value is far from; the theoretical one. to be studied.
Optimisation of injection with RCDS.
Undure curernt conditions beam SPX = 2 and SpY = 1 @ ric1 / BPM.02 stable.
Libera 4 freezed. Restart did not helped to recover BPM05-Lib04; Others after restart working well. Sever restart with astor solved the problem.
Saved data to reconstruct orbit
17:00 Arrêt machine
|