HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Entry   MJ KD HG; Synchro HS sst1charge.png
    Reply   ND; RE: Tentative identification pb synchro health_check_2023_02_21_12_34.pngScreenshot_from_2023-02-21_12-39-39.png
       Reply   ND; RE: RE: Tentative identification pb synchro 
          Reply   ND; RE: RE: RE: Tentative identification pb synchro 
Message ID: 691     Entry time: Tue Feb 21 12:32:54 2023     In reply to: 690     Reply to this: 693
 Author: ND 
 Status: Fixed 
 Type: Urgent 
 Category: Linac Commissionning 
 Important:
 Subject: RE: Tentative identification pb synchro 
 Icon:  

Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".

- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.

- Signaux sur les synthe et gene normaux.

- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.

- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.

- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable

Pas d'indication d'un probleme syncho.

 

 

 

MJ KD HG wrote:

10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas ?

c'est bon deremarrage serveur camera

Synchro HS on ne peut rien faire

reboot synthe baie 9 pour acquitter l'erreur network

Ca ne change rien

BESOIN URGENT d'un expert SYNCHRO

 

 

Attachment 1: health_check_2023_02_21_12_34.png  14 kB  | Hide | Hide all
health_check_2023_02_21_12_34.png
Attachment 2: Screenshot_from_2023-02-21_12-39-39.png  16 kB  | Hide | Hide all
Screenshot_from_2023-02-21_12-39-39.png
ELOG V3.1.4-395e101