Message ID: 638     Entry time: Fri Dec 2 08:27:45 2022
 Author: KD, ND, IC, VM, VK 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring | Ring Commissioning 
 Important:
 Subject: shift du 2 décembre 2022 
 Icon:  

8h15 : démarrage de la chauffe (Frigo, Modulateur, laser) 
Problème avec le login operateur (lent) et client1 freeze ==> redémarrage

~9h30 Access to the casemate to fix laser photodiode

The laser energy is 50 uJ

~10h00 Charge-phase scan

Phase Laser gun 130

~10h30 Injection in the ring. The full optimization should be done giben the change in the injection

 

phase RF section 116 deg. (was 89)

Good transport until the ring and good stability during the day.

12:00 Oscillations betatron observees dans l'anneau avec la cavite tunee and a bit of power ~100 W (see pictures)

Looking to improve number of turns in the cavity... Not possible to store the beam for more than ~10-20 turns.

La cavite a un effet en X (voir image ADC BPM)

We tried to measure the revolution frequency with the BPM connected to the scope. With the first analysis it is ~30*Frev = 499.87 MHz. To be checked. Several phase and freaquency scans with RF cavity. Usually working at 5-7 kW.

19h Machine stopped

 

Attachment 1: scan_charge_phase_min_100.0_max_360.0_10_9_48.png  45 kB  Uploaded Fri Dec 2 10:21:29 2022  | Hide | Hide all | Show all
scan_charge_phase_min_100.0_max_360.0_10_9_48.png
Attachment 2: Screenshot_from_2022-12-02_10-50-21.png  12 kB  Uploaded Fri Dec 2 10:50:43 2022  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2022-12-02_12-13-54.png  57 kB  Uploaded Fri Dec 2 12:14:39 2022  | Hide | Hide all | Show all
Screenshot_from_2022-12-02_12-13-54.png
Attachment 4: Screenshot_from_2022-12-02_16-54-23.png  64 kB  Uploaded Fri Dec 2 16:54:57 2022  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2022-12-02_17-15-22.png  99 kB  Uploaded Fri Dec 2 17:16:34 2022  | Hide | Hide all | Show all
Screenshot_from_2022-12-02_17-15-22.png
Attachment 6: Screenshot_from_2022-12-02_18-02-36.png  108 kB  Uploaded Fri Dec 2 19:07:28 2022  | Show | Hide all | Show all
Attachment 7: Screenshot_from_2022-12-02_17-55-27.png  56 kB  Uploaded Fri Dec 2 19:08:01 2022  | Hide | Hide all | Show all