Start of the machine by KD
11h20 The beam is in the ring
Optimization of the injection with the RCDS
Off-momentum injection from the injector
Based on the observation (attached here), it seems that there is a resonant excitation of the beam by the RF cavity. Difficult to scan with the dipole field.
=> The RF cavity should be checked and during the runs detuned.
=> Probably the priority to the RF cavity conditioning should be given to progress on the Ring comissioning
The BPM.04-LIB.03 (just before the FPC) gives a strange vertical orbit. This should be checked and further invetigated.
Test of the script to swotch off the machine by KD.
18h45 End of the shift
|