Message ID: 624     Entry time: Fri Nov 4 18:28:58 2022
 Author: VK, VM, IC, KD 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Ring commissioning 
 Icon:  

Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with the RCDS

Off-momentum injection from the injector

Based on the observation (attached here), it seems that there is a resonant excitation of the beam by the RF cavity. Difficult to scan with the dipole field.

=> The RF cavity should be checked and during the runs detuned.

=> Probably the priority to the RF cavity conditioning should be given to progress on the Ring comissioning

The BPM.04-LIB.03 (just before the FPC) gives a strange vertical orbit. This should be checked and further invetigated.

Test of the script to swotch off the machine by KD.

18h45 End of the shift

 

Attachment 1: charge_phase__at_04-11-2022__10-21-21.jpg  72 kB  | Hide | Hide all | Show all
charge_phase__at_04-11-2022__10-21-21.jpg
Attachment 2: Screenshot_from_2022-11-04_18-01-51.png  58 kB  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2022-11-04_18-02-32.png  196 kB  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2022-11-04_18-03-35.png  195 kB  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2022-11-04_18-24-36.png  177 kB  | Show | Hide all | Show all
Attachment 6: Screenshot_from_2022-11-04_18-24-58.png  61 kB  | Show | Hide all | Show all
Attachment 7: closed_orbit_04112022.png  195 kB  | Show | Hide all | Show all