9h19 : Mise en route modulateur et refroidissements
10h45: Start the Modulator
11h30 : Scan charge
Max chage : 238°
Max energy : 188°
12h : load recipe : recipe_recipe_LI_TL_RI_20221021_16_15_04.txt
Dipole TL switch off -> Beam on TL/DG/SST.01
12h30 : Dipole TL switch on
Beam on TL/DG/SST.02
Beam energy and enegy spread improved by increase phase to 204 (cf image) (dipoles at 156A)
12h45 : Injection dans l'anneau
calcul convetion A -> rad for kicker
13h50:
Test on TL/DG/SST.02
===
Program for the shift on 28/10
1) Start beam
2a) Measure respone of TL/SST.2 as function of time
2b) Try to put TL/SST2 on negative polarity
3) Study BPM attenuation
4) Test Alexandre's feedback
5) Cerenkov |