Message ID: 617     Entry time: Fri Oct 28 09:19:22 2022
 Author: SC/ND 
 Status:  
 Type: Anneau 
 Category: Linac Commissionning 
 Important:
 Subject: Démarrage faisceau et TP 
 Icon:  

9h19 : Mise en route modulateur et refroidissements

10h45: Start the Modulator

11h30 : Scan charge
Max chage : 238°
Max energy : 188°

12h : load recipe : recipe_recipe_LI_TL_RI_20221021_16_15_04.txt
Dipole TL switch off -> Beam on TL/DG/SST.01

12h30 : Dipole TL switch on
Beam on TL/DG/SST.02
Beam energy and enegy spread improved by increase phase to 204 (cf image) (dipoles at 156A)

12h45 : Injection dans l'anneau
calcul convetion A -> rad for kicker

13h50:
Test on TL/DG/SST.02


 

===

Program for the shift on 28/10

1) Start beam

2a) Measure respone of TL/SST.2  as function of time

2b) Try to put TL/SST2 on negative polarity

3) Study BPM attenuation

4) Test Alexandre's feedback

5) Cerenkov

Attachment 1: scan_charge_phase_min_200.0_max_280.0_12_4_46.png  46 kB  Uploaded Fri Oct 28 13:10:51 2022  | Hide | Hide all
scan_charge_phase_min_200.0_max_280.0_12_4_46.png
Attachment 2: 2022-10-28_12_39_29_tl_dg_sst_02-ccd_01_RAW.png  910 kB  Uploaded Fri Oct 28 13:41:08 2022  | Hide | Hide all
2022-10-28_12_39_29_tl_dg_sst_02-ccd_01_RAW.png
ELOG V3.1.4-395e101