Message ID: 590     Entry time: Fri Oct 14 09:05:46 2022
 Author: ND, VK, IC, VM, AL 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring | Ring Commissioning 
 Important:
 Subject: Shift du 14/10/2022 
 Icon:  

8:50 Mise en chauffe modulateur, allumage frigo+chiller

Resisistivete eau: 6,6Mo

9:05 Client2 plant'e => redemarrage

9:45 HV On

Scan charge phase. Max charge=255

Phase E_max 207

Q~ 130pC

Fermeture Iris laser jusqu'a 1mm

Q~100pC

Phase section dispersion min: 103.

TL/BPM.02:

X=1.08

Y=0.7

RMS position: 0.2mm

10:26 Beam in the ring

Optimization of the injection and storage (see fig attached). At the end, injection with no losees!

Preparation for the orbit correction eluminating not working correctors. After several studies and iterations, we suceeded to correct the orbit (see the fig attached). Meanwhile, it seems that the BPM  ri-c2/dg/bpm.04-lib.05 (quite certain as it did not respond to the corrector change) and probably  ri-c1/dg/bpm.04-lib.03 do not give the proper readings. This point should be checked as soon as possible.

Problem with ChD of the ri-c2/dg/bpm.04-lib.05 (see the fig attached). We checked the connection in the rack5. We found that the BPM ri-c2/dg/bpm.04-lib.05 ChA was swaped with ChA BPM ri-c2/dg/bpm.06-lib.05 => Slava changed it. Now it is OK. BUT still ChD stays without signal. The problem is in the casemat probably. To be checked.

Starting the preparation for the first tune estimation. For this, we switched ON the sextupoles (see fig attached). Withour sextupoles, the FFT signal is too "noisy".

Optimization of the injection with the multiparameter optimizer RCDS, work in progress.

Alims IHM is updated by Slava to have separetly hor. and vert. correctors displayed.

18h30 End of the Shift.

 

 

 

 

 

 

 

Attachment 1: scan_charge_phase_0_360.png  42 kB  Uploaded Fri Oct 14 10:53:40 2022  | Show | Hide all | Show all
Attachment 2: scan_charge_phase_min_240.0_max_280.0_10_7_12.png  42 kB  Uploaded Fri Oct 14 11:08:09 2022  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2022-10-14_17-01-27.png  56 kB  Uploaded Fri Oct 14 18:13:52 2022  | Hide | Hide all | Show all
Screenshot_from_2022-10-14_17-01-27.png
Attachment 4: FFT_TbT_tune.png  86 kB  Uploaded Fri Oct 14 18:14:56 2022  | Hide | Hide all | Show all
FFT_TbT_tune.png
Attachment 5: closed_orbit2_14102022.png  144 kB  Uploaded Fri Oct 14 18:15:45 2022  | Hide | Hide all | Show all
closed_orbit2_14102022.png
Attachment 6: Screenshot_from_2022-10-14_10-37-11.png  761 kB  Uploaded Fri Oct 14 18:28:10 2022  | Hide | Hide all | Show all
Screenshot_from_2022-10-14_10-37-11.png
Attachment 7: Screenshot_from_2022-10-14_17-30-30.png  299 kB  Uploaded Fri Oct 14 18:31:44 2022  | Hide | Hide all | Show all
Screenshot_from_2022-10-14_17-30-30.png
Attachment 8: Screenshot_from_2022-10-14_17-32-26.png  23 kB  Uploaded Fri Oct 14 18:33:49 2022  | Hide | Hide all | Show all
Screenshot_from_2022-10-14_17-32-26.png
Attachment 9: Screenshot_from_2022-10-14_17-46-56.png  189 kB  Uploaded Fri Oct 14 18:47:28 2022  | Hide | Hide all | Show all
Screenshot_from_2022-10-14_17-46-56.png
Attachment 10: Screenshot_from_2022-10-14_18-00-58.png  87 kB  Uploaded Fri Oct 14 19:22:40 2022  | Hide | Hide all | Show all
Screenshot_from_2022-10-14_18-00-58.png
ELOG V3.1.4-395e101