AM :
git pull sur $HOME_IHM
pression vanne vide : 8 bar
resistivité eau : 7.3 Mohm
Health_check :
Jauge dans l'anneau en erreur : -> verifier quel jauge a été supprimer est les enlever de la verification d'état
RI-C2/PS/STR.02-V.01 :
- En ALARM
- Status :
port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 SOFTWARE INTERLOCK
LI/OP/OPT.02-LAS.01-OSL.01:
- Etat : FAULT
- Status : OK
Est il pertinant de la conserver dans Health_Check et/ou de considéré que le "state" FAULT revoie une erreur "FAULT" ?
Moteur miroir laser en gris (state inconnu) :
- State : MOVING
-> ajout de l'état "MOVING" de gravité "OK" dans les fichier de config Health_Check
Pas de soucis empechant le démarrage de la machine !
8h30 : allumage frigo
allumage chiller
8h40: mise en chauffe Modulateur
8h50: allumage laser/ shutter de securuté fermé
10h modulateur démarré
10h30 scan charge phase Qmax 50pC à 275°
Trend mesure phase sortie oscillateur laser ne fonctionne pas (IP http://192.168.229.21)
visualisation OK sur Soft propriétaire
dipole passé 156.6A phase section 108
recharge recette recipe_recipe_LI_TL_RI_20220923_15_07_00.txt
11H
Injection dans l'anneau
13H15 HT modulateur off
14h restart the machine
Nicolas H and Alex L from SOLEIL came to participate in the shift.
Nicolas H configured phase_offset for all Libera to reduce the jutter in the TbtSum signal. After this, the signal became more stable.
Nicolas H, VC, VM and IC measured the jutter of the BPM wrt the injection trigger. it was found that the jitter is 12 ns !!!!! Then, it was also confirmed by measuring the jitter on the scitillator detector signal. This is a big problem, which should be considered/solved asap.
With the help of Alex L, the good transport is done until the last BPM of the Ring (see file attached). The task now is to try to futher correct the trajectory for the second turn. From the vertical orbit we suspect that dipoles could be missaligned at the IP region. To be checked if it is compatibe with the simulations.
Discussion on the allignment of the Ring should be organized to get the last measurement results and understand, what can be done in terms of the correction of the dipole tilts/shifts if it will be needed.
The example of the one possible trajectory is attached.
With the scintillator detector installed near the septum, we see the beginning of the second turn (see file attached). It is useful diagnostics as the BPM will give the evidence of the 3rd turn only (Libera averages the signal from 2 turns).
19h20 Tuning of the trajectory. More or less flat stable trajectory. Work is ongoing.
21h50 End of the shift
|