HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 42     Entry time: Mon Jun 28 11:45:12 2021
 Author: Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021 
 Status: Under Process 
 Type: Linac 
 Category: RF D1 | Linac Commissionning 
 Important:
 Subject: Attenuations  
 Icon: icon1.gif 

RF attenuations :

  • GUN (Maximun atténuation) Limite Hard = 1667 steps

  • Section (Minimum attenuation = 0 steps)

Notez la limite maximul d'attenuation. Les valeurs calibrées s'arretent avant.
Attachment 1: AttenuationCalibrationCurves.png  20 kB  Uploaded Mon Jun 28 12:47:24 2021  | Hide | Hide all | Show all
AttenuationCalibrationCurves.png
Attachment 2: Attenuation_sets.png  42 kB  Uploaded Mon Jun 28 12:48:52 2021  | Show | Hide all | Show all
ELOG V3.1.4-395e101