Voici le resumé de l'intervention Scandinova tiré du rapport de l'intervention du 07/02/2022 à 09/02/2022
***********************************
Summary of Work
Replaced EP2316-0008 module
Increased filters on HIU for Standby and HV
Increased filter for IntCom interlock
Suggested some mesh to added between Klystron and rack for EMC protection
Corrected some software parameters relating to filament and SPS to increase functionality
Reduced filters for water flow switches due to glitching averaging
A 24h Long Run was carried out. Modulator kept in HV for 24h prior
Conclusion
Problem did not occur while on site, actions taken to reduce the risk of unneccessary interlocks were taken
***************************************