7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h55 HV is ON
10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers adjusted, Laser phase 56 dg., Sect. Att. 0.191 dB, Sect. phase 255 dg. charges around -100 pC, laser att. 323,
Goal: same orbit as for 50 MeV for X rays.
Work on 70 MeV orbit.
Orbits were obtained near IP. Receipt 70 MeV: recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt
Work on 61.5 MeV
Receipt 61.5 MeV: recipe_recipe_LI_TL_RI_all_20260320_16_26_35.txt, F=500.034945 MHz
|