 Category: Laser 
 Important:
 Subject: , entered from 127.0.0.1 
 Icon:  

07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h00 HV is on

09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz

RF Gun phase 75 dg., Sect. att. 2.532 dB, sect. phase 220 dg., linac steerers: V [0.23 -2.68], V [-2.49 3.27], charges (BPMs) around -110 pC

At F=500.108655MHz and TL/BPM02 X=2mm the orbits are almost the same with and without RF (see screenshot)

At given ring settings, the MRSV size is highly dependent on the DPI, septum, and kicker settings, which are determined by the injection energy (Sect. att. and line phasing).

A combination of DPI, septum, and kicker settings should be adjusted to reduce the MRSV size.

12h35 The laser spot has moved outside the screen!!! Help needed!!!

Kevin fixed it.

Additional research showed that F=500.10045 MHz is suitable for ring operation.

15h55 ThomX was stopped.

 