Message ID: 1198     Entry time: Tue Feb 24 07:38:01 2026
 Author: KD, VM, RC, MJ, IC 
 Status: Under Process 
 Type: Shift summary 
 Category: Laser | Opt | Linac Commissionning | Ring Commissioning 
 Important:
 Subject: shift du 24 fevrier 2026 
 Icon:  

7h40: mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

 

*** Programme ***

- repartir de la recette "iniale" de jeudi avec un grand angle vertical à l'IP

- trouver le point de "bascule" horizontal de l'IP avec la CFP (point immobile en fonction de la phase CFP)

- Changer l'angle vertical pour trouver le minimum acceptable pour les spectres (par dicotomie)

08h36 HV is on

09h30 recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt loaded. RF Gun phase 42 dg., Sect. att. 2.57 dB, phase 213 dg. Linac steerers: H [-0.09 -2.76], V [-2.39 3.23], Charges (ICT) about -100 pC, BPMs - about -100 pC. RF cavity phase -33 dg.

09h50 Ramp to 280 kV

Laser phase appears unstable

10:34 AM Vertical orbit bump applied

13h41 RF cavity ramp down to 150 kV

18h00 Standby

The additional shunt resistor installed on third DP.

19h27 HV is on

19h40 Standby

The additional shunt resistor installed on sixth DP.

20h00 HV is on

20h20 Standby

The additional shunt resistor was removed on sixth DP.

20h52 HV is on

21h30 RF gun phase 87 dg. Sect. att. 2.442 dB, Sect. phase 222 dg. Charges (BPMs): around -110 pC, unstable.   Linac steerers: H [-0.19 -2.67], V [-2.43 3.30], RF cav. 150 kV, -33 dg.

22h30 Dispersion measurement

22h50 Beta functin  measurement


Data save in filename /tmp_mnt/data/iryna.chaikovska/mml/measdata/THOMX/StorageRingdata/QUAD/QuadBeta_2026-02-24_22-44-21.mat 
Tunes before mesurement nux = 0.1692 nuz = 0.7226 
Tunes after  mesurement nux = 0.1676 nuz = 0.7265 
maximum betabeat dbxobx = 32.7 % dbzobz =  6.8 % 
rms betabeat bx = 12.3 % rms bz =  2.9 % rms 

Frequency scan from 500.078 MHz to 500.124450 MHz

 

02h16 ThomX was stopped

Attachment 1: Screenshot_from_2026-02-24_14-09-27.png  107 kB  Uploaded Tue Feb 24 14:10:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-24_14-09-27.png
Attachment 2: Screenshot_from_2026-02-24_13-25-13.png  120 kB  Uploaded Tue Feb 24 14:10:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-24_13-25-13.png
Attachment 3: Screenshot_from_2026-02-24_12-26-16.png  115 kB  Uploaded Tue Feb 24 14:10:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-24_12-26-16.png
Attachment 4: Screenshot_from_2026-02-24_11-13-15.png  134 kB  Uploaded Tue Feb 24 14:10:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-24_11-13-15.png
Attachment 5: Screenshot_from_2026-02-24_10-40-40.png  147 kB  Uploaded Tue Feb 24 14:10:06 2026  | Show | Hide all | Show all
Attachment 6: Screenshot_from_2026-02-24_10-15-45.png  136 kB  Uploaded Tue Feb 24 14:10:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-24_10-15-45.png
Attachment 7: Screenshot_from_2026-02-24_21-26-32.png  54 kB  Uploaded Tue Feb 24 21:26:44 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-24_21-26-32.png