Message ID: 1193     Entry time: Tue Feb 17 07:48:24 2026
 Author: MJ, KD,VM,IC, RC, DN 
 Status: Under Process 
 Type: Shift summary 
 Category: Opt | Linac Commissionning | Ring Commissioning 
 Important:
 Subject: shift du 17 fevrier 2026 
 Icon:  

7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

Le cyclage de RI-C1/QP.08, RI-C1/QP.11 et RI-C2/QP.03 ne démarre pas tout seul (action nécessaire sur le boutton cyclage de l'élément).

Programme - Etude "IP dromadaire" ==> Scan pos horizontale FPC + phase 

Positions FENTES2/HEXA des 2 derniers shifts :
    Pos FENTE2 :    [H , V]  = [-3 , -10.20]
    Pos HEXA ech : [Tx , Ty] = [+79 , +31]

10h00 Beam is in the ring W/O RF, -120 pC, receipt saved: recipe_recipe_LI_TL_RI_all_20260217_09_44_16.txt on the base of reference for 50 MeV

recipe_recipe_LI_TL_straight_all_20260217_10_08_07.txt for the linac and the TL stright part

RF 100 kV phase -48.5 dg.

10h35 Standby, Changing the FPC controller

11h23 HV is on

11h40 RCDSon injection

11h59 RF gun phase 23 dg., Sect. Att. 2.39 dB, Phase 230 dg., Charges: (ICT) from -120 to 140 pc, (BPMs) -137, -137, 137, 137 pC

tunes: H 0.166, V 0.71

12h26 tunes: H 0.167, V 0.72. MRSV size is very sensetive to injection settings

At around 2:45 p.m., the power to the ring dipole went out.

16h42 RF 280 kV, phase -50 dg. Streak camera measurements for 100 kV and 280 kV

Orbit bump to change orbit tilt around IP

18h59 Stop ThomX

 

 

 

Attachment 1: Screenshot_from_2026-02-17_13-06-31.png  28 kB  Uploaded Tue Feb 17 13:35:06 2026  | Show | Hide all | Show all
Attachment 2: Screenshot_from_2026-02-17_13-06-18.png  30 kB  Uploaded Tue Feb 17 13:35:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_13-06-18.png
Attachment 3: Screenshot_from_2026-02-17_12-48-03.png  72 kB  Uploaded Tue Feb 17 13:35:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_12-48-03.png
Attachment 4: Screenshot_from_2026-02-17_12-47-33.png  94 kB  Uploaded Tue Feb 17 13:35:06 2026  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2026-02-17_12-47-04.png  498 kB  Uploaded Tue Feb 17 13:35:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_12-47-04.png
Attachment 6: Screenshot_from_2026-02-17_12-37-42.png  127 kB  Uploaded Tue Feb 17 13:35:06 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_12-37-42.png
Attachment 7: Screenshot_from_2026-02-17_18-30-41.png  29 kB  Uploaded Tue Feb 17 18:32:40 2026  | Show | Hide all | Show all
Attachment 8: Screenshot_from_2026-02-17_18-29-37.png  28 kB  Uploaded Tue Feb 17 18:32:40 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_18-29-37.png
Attachment 9: Screenshot_from_2026-02-17_18-03-02.png  73 kB  Uploaded Tue Feb 17 18:32:40 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_18-03-02.png
Attachment 10: Screenshot_from_2026-02-17_18-02-44.png  124 kB  Uploaded Tue Feb 17 18:32:41 2026  | Hide | Hide all | Show all
Screenshot_from_2026-02-17_18-02-44.png
ELOG V3.1.4-395e101