08h25 Warm-up ThomX: Modulator, Laser, Fridge

08h33 Chillers were started, cycling all magnets.

09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9

09h33 Sect. Att. 30 dB, RF Gun Att. 20 dB, HV 1030 V Interlock

09h39 Sect. Att. 30 dB, RF Gun Att. 20 dB, HV 1050 V Interlock. Something wrong

10h20 HV 1050 V. Maher is here. Interlock by reflected power to the klystron.

10h26 Modulator is on standby.

10h29 HV is on W/O RF. HV 1215 V. All is OK.

10h34 Modulator is on standby.

10h57 HV is on, 1030 V

11h09 HV is  1050 V

11h35 50pps, 1030V

11h42 1040 V interlock

11h45 Modulator is on standby.

16h10 Stop ThomX

 