Message ID: 1183     Entry time: Fri Jan 16 08:29:33 2026
 Author: IC, VM, ND 
 Status: Under Process 
 Type: Shift summary 
 Category:  
 Important:
 Subject:  
 Icon:  

08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.

10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl :   recipe_recipe_TL_all_20260116_10_52_12.txt, recipe_recipe_LI_TL_straight_all_20260116_10_51_52.txt. Linac steerers: H [0.59 -2.74], V [-2.48 3.06]

RF Gun phase 140 dg. Sect. Att. 2.523 dB, Sect. phase  190 dg. Laser att. 409, charges (BPMs): -100, -95, -98, -98 -97 pC angry, RF 100 kV, phase -8.5 dg. The MRSV camera dozs not operate.

11h44 Problem with cameras

All triggers dissapeared

Nicolas fixed it, but phases is different: RF gun phase 96 dg., sect phase 203 dg. RF cav. phase?

12h50 Laser phase jumped to 171 dg. Sect. phase ==> 210 dg. Manual phase shifter set back to 1176. The laser att. ==> 359 for RF gun charge -115 pC (BPM)

Ring studies Model-Machine

From time to time laser fase jumps.

Triggers stopped. Nicolas is looking at it.

14h40 Beam dissapears in between the studies. Every time we retune the linac...

No triggers!!!!

18h04 LOCO is on its way. Time to times the laser loses phase synchronization. It's terrible.angry

18h20 We've lost laser synchronization.

18h21 Stop ThomX

 

Attachment 1: Screenshot_from_2026-01-16_18-28-24.png  76 kB  Uploaded Fri Jan 16 18:28:52 2026  | Hide | Hide all | Show all
Screenshot_from_2026-01-16_18-28-24.png
Attachment 2: Screenshot_from_2026-01-16_13-22-12.png  30 kB  Uploaded Fri Jan 16 18:30:41 2026  | Hide | Hide all | Show all
Screenshot_from_2026-01-16_13-22-12.png
Attachment 3: Screenshot_from_2026-01-16_13-23-01.png  93 kB  Uploaded Fri Jan 16 18:32:09 2026  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2026-01-16_13-31-16MODEl.png  258 kB  Uploaded Fri Jan 16 18:33:01 2026  | Hide | Hide all | Show all
Screenshot_from_2026-01-16_13-31-16MODEl.png
Attachment 5: Screenshot_from_2026-01-16_16-02-15LOCO_1it.png  92 kB  Uploaded Fri Jan 16 18:33:48 2026  | Hide | Hide all | Show all
Screenshot_from_2026-01-16_16-02-15LOCO_1it.png
ELOG V3.1.4-395e101