Message ID: 1168     Entry time: Fri Dec 12 08:40:50 2025
 Author: VM, IC 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Check of the 70 MeV with MRSV, Ring studies 
 Icon:  

08h40 Warm-up ThomX: Modulator, Laser, Fridge

8h45 Chillers were started, cycling all magnets.

10h10 HV is ON

10h14 Going to 70 MeV

10h44 Beam is in the ring W/O RF, 70 MeV

Manual ring shifter set to 6124 RF 50 kV

11h56 Ring RF set to 100 kV RF phase 17.5 dg.

13h34 Good receipt  recipe_recipe_LI_TL_RI_good_20251212_13_56_38.txt copied to references as 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt

Rf gun phase 239 dg., Sect. Att. 0.18 dB, Phase 243 dg., TL/BPM2 X=-1mm,  linac correctors H [1.0 -3.32], V [-2.02 2.10], Charges: -85, -81, -82, 84, -82 pA, Laser Att.  281.

MRSV fills the all slit. Storage up to 100%

14h10 ==> 50 MeV Manual phase shifter value set to 4876. Sect. temperatute set to 30C (clarinette, consigne = 29.2C).

14h39 Beam is in the ring.

14h40 HV on standby, Cycling all magnets.

15h08 HV is ON Receipt: recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt. Copied to references: 50_MeV_good_tune_0.17_0.7_20251212_16_03_54.txt

MRSV size at 50 MeV down to 23 pix.

Studies Model_real Machine for the ring. Data to be analyzed.

17h07 Stop ThomX

 

 

 

 

Attachment 1: Screenshot_from_2025-12-12_14-02-43.png  27 kB  Uploaded Fri Dec 12 16:55:00 2025  | Show | Show all
Attachment 2: Screenshot_from_2025-12-12_14-02-27.png  17 kB  Uploaded Fri Dec 12 16:55:01 2025  | Show | Show all
Attachment 3: Screenshot_from_2025-12-12_14-02-14.png  75 kB  Uploaded Fri Dec 12 16:55:01 2025  | Show | Show all
Attachment 4: Screenshot_from_2025-12-12_14-02-02.png  60 kB  Uploaded Fri Dec 12 16:55:01 2025  | Show | Show all
Attachment 5: Screenshot_from_2025-12-12_14-01-35.png  118 kB  Uploaded Fri Dec 12 16:55:01 2025  | Show | Show all