Message ID: 1147     Entry time: Fri Nov 7 18:45:54 2025
 Author: Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning 
 Important:
 Subject:  
 Icon:  

08h34  Warm-up ThomX: Modulator, Laser, Fridge

08h40 Chillers were started, cycling all magnets

09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked.

10h40 Modulator set to standby, because nobody responded.

SF6 pressure was fixed.

14h00 Beam started. The laser iris was set to 2 mm because at 1.3 mm beam was with two cores at the linac exit.

Receipt used: all_20251106_13_58_04

RF gun phase 233 dg. Sect. phase 211 dg., Motor position of the sect. Att. about 1700 steps to get 50 MeV. Charges (BPMs):  -110 pC, -110 pC, -113 pC, -113 pC. Do not use calc/li/hfi/att.01-mot.01 to adjust section RF power in dB, use li/hfi/att.01-mot.01 instead.  Level of a signal from the section output should be about -0.125 V at 50 MeV.

14h16 Beam is in the ring, RF 100 kV. TL/BPM02 X=-1mm.

BBA for a vertical direction.

BPM V [1 1] V offset = -0.054 mm

BPM V [1 6] V offset = 0.165 mm

BPM V [1 7] V offset = 0.025 mm

BPM V [1 12] V offset = 0.366 mm

16h29 Stop ThomX

  

Attachment 1: Screenshot_from_2025-11-07_16-24-10.png  289 kB  | Hide | Hide all | Show all
Screenshot_from_2025-11-07_16-24-10.png
Attachment 2: Screenshot_from_2025-11-07_16-24-35.png  84 kB  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2025-11-07_16-23-58.png  120 kB  | Hide | Hide all | Show all
Screenshot_from_2025-11-07_16-23-58.png
ELOG V3.1.4-395e101