08h34 Warm-up ThomX: Modulator, Laser, Fridge
08h40 Chillers were started, cycling all magnets
09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked.
10h40 Modulator set to standby, because nobody responded.
SF6 pressure was fixed.
14h00 Beam started. The laser iris was set to 2 mm because at 1.3 mm beam was with two cores at the linac exit.
Receipt used: all_20251106_13_58_04
RF gun phase 233 dg. Sect. phase 211 dg., Motor position of the sect. Att. about 1700 steps to get 50 MeV. Charges (BPMs): -110 pC, -110 pC, -113 pC, -113 pC. Do not use calc/li/hfi/att.01-mot.01 to adjust section RF power in dB, use li/hfi/att.01-mot.01 instead. Level of a signal from the section output should be about -0.125 V at 50 MeV.
14h16 Beam is in the ring, RF 100 kV. TL/BPM02 X=-1mm.
BBA for a vertical direction.
BPM V [1 1] V offset = -0.054 mm
BPM V [1 6] V offset = 0.165 mm
BPM V [1 7] V offset = 0.025 mm
BPM V [1 12] V offset = 0.366 mm
16h29 Stop ThomX
|