08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON
09h49 HV was set to 1215 V
10h15 the receipt recipe_recipe_LI_TL_RI_all_20251023_12_06_10.txt was loaded, linac phases, section attenuator and steerers was adjusted
10h20 The beam is in the ring W/O RF. RF Gun phase 215 dg., Sect. phase 207 dg., Sect. Att. 2.47 dB, TL/BPM02 X=-2mm, Laser Att. 274,Charges (BPMs) -110, -109, -80, -80 ???
10h33 Data taking for different TL/BPM02 X
10h50 RF 100 kV, Phase 11 dg. YL/BPM02 x=-3 to -4 mm, Very good storage, but losses in the TL, Check alignment
11h11 RF gun phase 202 dg. Secr. phase 206 dg. RF phase 3.5 dg. All charges are about -100 pC
11h27 TL/BPM02 X ==> 0 mm to minimize Sync. osc. Hor. Tun 0. 159
11h41 Hor. tun ==> 0.169
11h56 BBA
12h21 RF Gun phase ==> 207 dg.
12h32 Hv was set on standby
13h44 HV is ON
14h14 RF Gun phase ==> 211 dg.
16h52 Stop ThomX |