11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V

12h50 Cycling all magnets

13h40 Beam is in the ring without RF

13h50 The FR cavity power has been restarted.

14h14 RF Gun phase 221 dg. Sect. Phase 206 dg. Sect. Att. 2.42 dB Laser Att. 286 Charges:  -99 pC, -99 pC, -100 pC Linac steerers H [0.84 -3.18] V [-2.46  3.03]. MRSV light on the streak camera

14h31 The modulator is on standby. Daniele goes to the bunker with Marie to install the horizontal slit for MRSV

14h52 HV is ON

Image MRSV sigX=36.2 sigy=14.8 pixels 

Intensite sur la streak reduite ==> On va essayer de deplacer la fente du coup

15h09 The modulator is on standby. Daniele goes to the bunker with Marie.

15h33 HV is ON

15h33 Image MRSV sigX=46.7 sigy=14.8 pixels  avec la nouvelle positions de la fente - cf screenshot