11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V
12h50 Cycling all magnets
13h40 Beam is in the ring without RF
13h50 The FR cavity power has been restarted.
14h14 RF Gun phase 221 dg. Sect. Phase 206 dg. Sect. Att. 2.42 dB Laser Att. 286 Charges: -99 pC, -99 pC, -100 pC Linac steerers H [0.84 -3.18] V [-2.46 3.03]. MRSV light on the streak camera
14h31 The modulator is on standby. Daniele goes to the bunker with Marie to install the horizontal slit for MRSV
14h52 HV is ON
Image MRSV sigX=36.2 sigy=14.8 pixels
Intensite sur la streak reduite ==> On va essayer de deplacer la fente du coup
15h09 The modulator is on standby. Daniele goes to the bunker with Marie.
15h33 HV is ON
15h33 Image MRSV sigX=46.7 sigy=14.8 pixels avec la nouvelle positions de la fente - cf screenshot |