Message ID: 1138     Entry time: Thu Oct 16 07:37:52 2025
 Author: KD, IC, VM 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning | Ring Commissioning 
 Important:
 Subject: shift du 16 octobre 2025 
 Icon:  

7h30: mise en chauffe en remote (chillers/frigo, laser, cyclage)

==> impossible de passer en Standby sur le modulateur ==> mail envoyé à Maher.

8h30 We inspected the modulator, made the rondes. The error (status 8 bit) remains. Need for help from Maher. problem: Modumator PSS.

09h12 Maher started the modulator (there was problem with cooling)

10h30 HV is ON

10h44 RF Gun phase is 228 dg Laser Att. 280, Charge device does not work properly

11h18 RCDS on injection, Beam is in the ring

11h20 Modulator went to OFF then start to warm-up

The RF cavity DS  can not read ring RF frequency

12h28 HV ON

Restarting the beam

Working on the WP 50 MeV, orbit correction after dipole rotation. Recette:

TL and EL tuning and measurement of the energy spread.

Beam cut issue in EL investigations.

Optics studies. LOCO.

19h50 STOp THOMX

Attachment 1: Screenshot_from_2025-10-16_19-07-23.png  57 kB  Uploaded Thu Oct 16 20:44:51 2025  | Show | Hide all | Show all
Attachment 2: Screenshot_from_2025-10-16_18-49-04.png  91 kB  Uploaded Thu Oct 16 20:45:02 2025  | Hide | Hide all | Show all
Screenshot_from_2025-10-16_18-49-04.png
Attachment 3: EL_EnergySpread.png  58 kB  Uploaded Thu Oct 16 20:45:25 2025  | Hide | Hide all | Show all
EL_EnergySpread.png
Attachment 4: Screenshot_from_2025-10-16_19-11-13.png  155 kB  Uploaded Thu Oct 16 20:46:29 2025  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2025-10-16_19-20-55.png  47 kB  Uploaded Thu Oct 16 20:46:43 2025  | Show | Hide all | Show all
Attachment 6: TL_EnergySpread.png  54 kB  Uploaded Thu Oct 16 20:49:42 2025  | Show | Hide all | Show all
ELOG V3.1.4-395e101