7h30: mise en chauffe en remote (chillers/frigo, laser, cyclage)
==> impossible de passer en Standby sur le modulateur ==> mail envoyé à Maher.
8h30 We inspected the modulator, made the rondes. The error (status 8 bit) remains. Need for help from Maher. problem: Modumator PSS.
09h12 Maher started the modulator (there was problem with cooling)
10h30 HV is ON
10h44 RF Gun phase is 228 dg Laser Att. 280, Charge device does not work properly
11h18 RCDS on injection, Beam is in the ring
11h20 Modulator went to OFF then start to warm-up
The RF cavity DS can not read ring RF frequency
12h28 HV ON
Restarting the beam
Working on the WP 50 MeV, orbit correction after dipole rotation. Recette:
TL and EL tuning and measurement of the energy spread.
Beam cut issue in EL investigations.
Optics studies. LOCO.
19h50 STOp THOMX |