HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 1094     Entry time: Thu Jun 26 08:55:15 2025
 Author: IC, DN, RC, HG, ME 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Improve ring for X-rays  
 Icon:  

Goal: Vertical orbit and angle at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and all the machine

Camera SST2 : impossible de changer le temps d'expo angry   and SST3 not started indecision

  • Phase max Q = 333° with Q = 130 pC
  • Phase Sec : 203°  and Att = 2.46 dB
  • Aligned quads

With the previously saved receipt, the injection and charge of the stored beam was quite bad. We tried several receipts. We tried to tune the ring till ~16h.

The FPC was operated in synchronous mode with the power twice less as typical value.

The TL transport was different from previously used. We should try to keep the same orbit in the TL for reproducibility. 

The FPC scan showed the two peaks structure => to be understood.

Then, we re-loaded the lattice from folder Reference (changed the laser position @photocathode). With the energy-phase adjustments we arrived to the resonable conditions. The FPC scan is attached.

Both I3 and I4 were recorded/displayed during the shift. In this configuraiton, the X-ray signal was mainly maximized and I3 ~7k-8k pA (I4~ a few hundreds of pA).

The vertical orbit was modifief to have zero angle at the IP. See the plot attached. 

In this configuraiton, the X-ray signal was almost equally shared between I3 and I4 ~ 1k pA.

A proper conditions and FoM should be defined for further optimization procedures. 

18h15 STOP THOMX

Attachment 1: flat_orbit2025-06-26_17-49-26.png  28 kB  Uploaded Thu Jun 26 19:15:42 2025  | Show | Hide all | Show all
Attachment 2: flat_orbit2025-06-26_17-52-31.png  146 kB  Uploaded Thu Jun 26 19:15:42 2025  | Hide | Hide all | Show all
flat_orbit2025-06-26_17-52-31.png
Attachment 3: flatOrbit_FPCmanualScan2025-06-26_18-00-39.png  23 kB  Uploaded Thu Jun 26 19:15:42 2025  | Show | Hide all | Show all
Attachment 4: oscillations_synchro_sortie_BPM_2025-06-26_15-51-10.png  250 kB  Uploaded Thu Jun 26 19:15:42 2025  | Hide | Hide all | Show all
oscillations_synchro_sortie_BPM_2025-06-26_15-51-10.png
Attachment 5: Screenshot_from_2025-06-26_17-03-44.png  53 kB  Uploaded Thu Jun 26 19:15:42 2025  | Hide | Hide all | Show all
Screenshot_from_2025-06-26_17-03-44.png
Attachment 6: SimilarI3I4_2025-06-26_18-06-49.png  30 kB  Uploaded Thu Jun 26 19:15:42 2025  | Show | Hide all | Show all
Attachment 7: TLSST2_BeamProfile.png  157 kB  Uploaded Thu Jun 26 19:15:42 2025  | Show | Hide all | Show all
ELOG V3.1.4-395e101