Message ID: 1084     Entry time: Fri Jun 6 08:17:31 2025
 Author: MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'

Scans of phase charge were performed

10h22 Beam in the ring, receipt from 20250605_17_33_45. Linac steerers: H [0.36 -2.55], V [-2.36 2.66], Phases: RF Gun  165 dg., Sect. 214 dg., Sect Att. 2.6, TL/BPM2 X=0, Charges (BPMs): -114 pC, -113 pC,  -125 pC, -125 pC

MRSV: Hor. Std = 19.2812 pix, Vert. Std = 13.8814 pix

11h40 Going to 70 MeV. Sect. Att. 0.228, Phase 237 dg., RF Gun Phase 150 dg.

 

At F RF cavity 500.0328 MHz interlock on water cooling. Fixed by JN.

Trying to find horizontal tune.

At 70 MeV the MRSV camera saturated.

Work on the orbit correction.

Vertical scan with FPC. Sigma _y = 

The receipy is saved and can be used for the spectrum measurements. Further studies to be continued if needed.

FPC Table Vertical Scan: sigma Y =132 um

17h02 Stop ThomX

Attachment 1: ThomX_PhaseChargeScan20250606.png  101 kB  Uploaded Fri Jun 6 17:20:00 2025  | Hide | Hide all
ThomX_PhaseChargeScan20250606.png
Attachment 2: ThomX_FPC_TableVerticalScan20250606.png  72 kB  Uploaded Fri Jun 6 17:29:00 2025  | Hide | Hide all
ThomX_FPC_TableVerticalScan20250606.png
ELOG V3.1.4-395e101