08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets cycling

Filesystem very slow

Allarm vacuum valve are in alarm

RAC.17-RDP.01 still faulty

09h38 HV is 'ON'

10:15 Calc DS for attenuators was crashed. It restarted at 0dB attenuation...

12:43 SR on target with Iris closed

Alignemnt...

17:30 Measurement of the bunch length in the ring  ~140ps

Attachment 1: health_check_Vide_Jauge_2025_04_17_09_25.png  104 kB  Uploaded Thu Apr 17 10:26:44 2025  | Hide | Hide all | Show all
health_check_Vide_Jauge_2025_04_17_09_25.png
Attachment 2: health_check_RF_Redpitaya_2025_04_17_09_27.png  32 kB  Uploaded Thu Apr 17 10:28:08 2025  | Show | Hide all | Show all
Attachment 3: bpm_1_vs_kicker_second.png  59 kB  Uploaded Thu Apr 17 12:19:36 2025  | Hide | Hide all | Show all
bpm_1_vs_kicker_second.png
Attachment 4: viewer_2025_04_17_12_44_06.png  468 kB  Uploaded Thu Apr 17 13:44:32 2025  | Hide | Hide all | Show all
viewer_2025_04_17_12_44_06.png
Attachment 5: 20250417_175615.jpg  3.433 MB  Uploaded Thu Apr 17 19:09:01 2025  | Hide | Hide all | Show all
20250417_175615.jpg
ELOG V3.1.4-395e101