9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)
*** programme ***
- alignement du rayonnement synchrotron et mesure longueur de paquet dans l'anneau.
- mise en place de la visu du MRSV
17h13 50 MeV. Receipt from 20250313_17_59_00 (Storage X ray 40k pA ) loaded, but Linac steerers set to H [0.73 -2.82], V [-2.5 2.92], RCDS on injection. Saved as 20250410_17_32_06.
RF gun phase is 235 dg., Sect. phase is 222 dg., Att. is 2.4 dB. TL/BPM2 X= 3.5 mm, tunes are: H 0.165, V 0.526
18h49 Stop ThomX |