Message ID: 1038     Entry time: Fri Mar 14 08:31:19 2025
 Author: VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025 
 Status: Under Process 
 Type: Shift summary 
 Category: LI | Diag 
 Important:
 Subject: Streak camera measurements 
 Icon:  

08h28 Start Thomx: Modulator, Laser, Frig

08h33 Chillers were started, cycling al magnets

9h00 MPS affichage: Arret d'urgence... Appel Nourredine, probleme resolu.

9h30 Laser aligned on streak camera

Fix technical issues.

11:00 First measurements with streak camera

13:00 Viktor repotimizes the linac.

New measurements.

Measured length 9.2ps, including ~1ps due to spot size.

Shot to shot jitter ~2.9ps (over 100 shots).

16h10 Vacuum interlocks V1

New measurments, the phase has drifted. Bunch is longer.

17h00 Stop ThomX

Attachment 1: Measurements_summary.png  17 kB  Uploaded Fri Mar 14 17:37:33 2025  | Hide | Hide all | Show all
Measurements_summary.png
Attachment 2: phase_217.png  563 kB  Uploaded Fri Mar 14 17:43:12 2025  | Hide | Hide all | Show all
phase_217.png
Attachment 3: phase_224.png  609 kB  Uploaded Fri Mar 14 17:43:29 2025  | Show | Hide all | Show all
Attachment 4: phase_208.png  449 kB  Uploaded Fri Mar 14 17:43:44 2025  | Hide | Hide all | Show all
phase_208.png
Attachment 5: CR_V1_Blank100ms_linacOptimisedPhase_213_014.png  751 kB  Uploaded Mon Mar 17 16:28:19 2025  | Show | Hide all | Show all