08h28 Start Thomx: Modulator, Laser, Frig
08h33 Chillers were started, cycling al magnets
9h00 MPS affichage: Arret d'urgence... Appel Nourredine, probleme resolu.
9h30 Laser aligned on streak camera
Fix technical issues.
11:00 First measurements with streak camera
13:00 Viktor repotimizes the linac.
New measurements.
Measured length 9.2ps, including ~1ps due to spot size.
Shot to shot jitter ~2.9ps (over 100 shots).
16h10 Vacuum interlocks V1
New measurments, the phase has drifted. Bunch is longer.
17h00 Stop ThomX |