Message ID: 1028     Entry time: Wed Mar 5 08:53:34 2025
 Author: VM, VC, RC, DN 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h53 Start ThomX

11h10 The oscilloscope installed in the bunker

11h11 HV is 'On'

11h45 The beam is in the ring

12h10 The modulator set to the Standby mode. Access to the bunker

12h24 HV is 'On'

12h30 RF Gun Phase is 15 dg., Sect. phase is 204 dg., Att. is 2.503 dB, TL/BPM2 X= 4 mm, Charges: -108 pC, -108 pC, -120 pC  

12h35 Feedback on linac injection was started

13h00 Measurement of the stability of the temporal position of electron and photon bunches at the IP. RF Cav. at 200 kV, Phase 35 dg.

13h07 The linac was adjusted: RF Gun phase 10 dg., Sect phase 199 dg. Charges: -100 pC,-99 pC, -110 pC, Inj. qual. 0.965, Storage qual. 0.802

14h26 The linac was adjusted: RF Gun phase 11 dg., Sect phase 203 dg. Charges: -99 pC,-99 pC, -109 pC, Inj. qual. 0.984, Storage qual. 0.747, X ray flux I3=25000 pA

Phase between electron beam and FP photon have been done (attachements will come later) (Electron beam is a pickup (150ps fall time) at the IP and Photon beam  is a photo diode (300ps rise time) at the FP cavity output).

time jitter is measured as the time difference between the two ulses at a fixed treshhold of 10mV)

measurements show a 33ps FWHM jitter (15ps)   as long as the FPC is locked on the 500MHz . the jitter mainly come from FPC (see post FPC : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/416)

15h35 The linac was adjusted: RF Gun phase 19 dg., Sect phase 212 dg. Charges: -105 pC,-104 pC, -115 pC, Inj. qual. 0.988, Storage qual. 0.786,

17h45 Stop ThomX

 

Attachment 1: JItter_laserFP-Ebeamring-4.png  446 kB  Uploaded Wed Mar 5 15:24:15 2025  | Show | Hide all | Show all
Attachment 2: JItter_laserFP-Ebeamring.png  443 kB  Uploaded Wed Mar 5 15:26:34 2025  | Hide | Hide all | Show all
JItter_laserFP-Ebeamring.png
Attachment 3: 2025-03-05_15_11_40_li_dg_sst_01-ccd_01_RAW.png  365 kB  Uploaded Wed Mar 5 16:58:48 2025  | Show | Hide all | Show all
Attachment 4: 2025-03-05_14_17_36_tl_dg_sst_03-ccd_01_RAW.png  184 kB  Uploaded Wed Mar 5 16:58:49 2025  | Hide | Hide all | Show all
2025-03-05_14_17_36_tl_dg_sst_03-ccd_01_RAW.png
Attachment 5: 2025-03-05_14_14_49_tl_dg_sst_01-ccd_01_RAW.png  68 kB  Uploaded Wed Mar 5 16:58:49 2025  | Hide | Hide all | Show all
2025-03-05_14_14_49_tl_dg_sst_01-ccd_01_RAW.png
Attachment 6: 2025-03-05_14_14_19_tl_dg_sst_01-ccd_01_RAW.png  41 kB  Uploaded Wed Mar 5 16:58:49 2025  | Hide | Hide all | Show all
2025-03-05_14_14_19_tl_dg_sst_01-ccd_01_RAW.png
Attachment 7: 2025-03-05_14_13_20_tl_dg_sst_02-ccd_01_RAW.png  8.026 MB  Uploaded Wed Mar 5 16:58:49 2025  | Show | Hide all | Show all
Attachment 8: 2025-03-05_14_13_01_tl_dg_sst_02-ccd_01_RAW.png  8.026 MB  Uploaded Wed Mar 5 16:58:49 2025  | Hide | Hide all | Show all
2025-03-05_14_13_01_tl_dg_sst_02-ccd_01_RAW.png
Attachment 9: 2025-03-05_11_31_26_tl_dg_sst_02-ccd_01_RAW.png  8.039 MB  Uploaded Wed Mar 5 16:58:49 2025  | Hide | Hide all | Show all
2025-03-05_11_31_26_tl_dg_sst_02-ccd_01_RAW.png
Attachment 10: 2025-03-05_11_18_31_li_dg_sst_01-ccd_01_RAW.png  348 kB  Uploaded Wed Mar 5 16:58:49 2025  | Show | Hide all | Show all
Attachment 11: Screenshot_from_2025-03-05_16-56-31.png  19 kB  Uploaded Wed Mar 5 17:01:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-03-05_16-56-31.png
Attachment 12: Screenshot_from_2025-03-05_16-55-08.png  114 kB  Uploaded Wed Mar 5 17:01:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-03-05_16-55-08.png
Attachment 13: Screenshot_from_2025-03-05_16-52-56.png  21 kB  Uploaded Wed Mar 5 17:01:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-03-05_16-52-56.png
Attachment 14: Screenshot_from_2025-03-05_16-52-45.png  17 kB  Uploaded Wed Mar 5 17:01:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-03-05_16-52-45.png
Attachment 15: Screenshot_from_2025-03-05_16-52-33.png  63 kB  Uploaded Wed Mar 5 17:01:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-03-05_16-52-33.png
Attachment 16: Screenshot_from_2025-03-05_16-52-19.png  57 kB  Uploaded Wed Mar 5 17:01:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-03-05_16-52-19.png
ELOG V3.1.4-395e101