08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11h23 HV is 'On'
11h46 RF Gun Phase is 28 dg. Sect Att. is 2.54 dB, Phase is 209 dg. TL/BPM2 X=0, Charges: -88, -92, -96 pC
Linac correctors: H [0.59 -2.86], V [-3.23 3.47]
12h24 Beam in the ring RF 50 kV, Phase 44 dg.
12h35 RF 150kV, Phase 32 Kicker delay 7.3952 us, 9497 V
17h10 HV on 'Sttandby', the laser gate closed, injection kicker pulse correction
17h52 injection kicker pulse was corrected
HV is 'On'
18h39 The beam is in the ring. It is OK!
18h45 Stop ThomX |