9:20 Start aligning
12:40 Alignement done for both linac and ring.
Health check: Archiving not working
12:52 Start beam
Pb temperature gun and section
14:00 Beam on Cerenkov
Fixing misc. problems.
One motor of the MRSV mirror is dead.
17:30 Beam length measurement. t~15ps (convoluted with transport and focalisation)
*Note:*
- Time lost due to chiller problems
|