20
|
Thu Mar 4 16:59:43 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021 | Under Process | Shift summary | Prise de donnees |
|
tests redpitaya 4 | | Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section) |
 |
|
19
|
Thu Mar 4 16:57:46 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021 | Under Process | Shift summary | Prise de donnees |
|
tests redpitaya 3 | | Tests des redpitayas 3 voie 1 (Pi canon)
et voie 2 (Pr canon) |
 |
|
2
|
Tue Jul 7 14:25:15 2020 |
Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020 | Under Process | Shift summary | Prise de donnees |
|
test régulation températures canon/section | | Ouverture des chillers et du frigo sur
place.
Ouverture de l'IHM plateforme |
|
|
Draft
|
Wed Jul 8 14:33:04 2020 |
Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020 | Under Process | Shift summary | Prise de donnees |
|
test moteur solénoide en charge | | Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement. |
|
|
24
|
Wed Aug 17 11:42:41 2022 |
MO HM | Under Process | Info | Prise de donnees |
|
test RF modulateur longue durée (journée) | | but : test fonctionnement modulateur et
RF sur la journée
8h55 démarrage modulateur |
|
|
7
|
Thu Dec 3 13:45:13 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020 | Fixed | Info | docs |
|
signal photodiode laser | | |
|
|
8
|
Thu Dec 3 13:50:27 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020 | Fixed | Info | Prise de donnees |
|
signal photodiode 03-12-20 | | |
|
|
18
|
Thu Mar 4 16:56:19 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021 | Under Process | Shift summary | Prise de donnees |
|
redpitaya 2 | | Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre |
|
|
23
|
Wed Aug 17 09:48:31 2022 |
HM MO | Under Process | Info | Prise de donnees |
|
redemarrage 17 aout 2022 | | 9h30 redemarrage HM MO
- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur |
|
|
11
|
Wed Dec 9 14:26:35 2020 |
Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020 | Fixed | Info | etc |
|
re-organisation PC-client en SdC | | suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé |
|
|
52
|
Fri Mar 31 10:37:18 2023 |
KD | Under Process | Other | Prise de donnees |
|
mesures et shifts Linac | | Réunion 31/03
Prochaines mesures à faire
: |
|
|
22
|
Fri Mar 4 11:07:28 2022 |
CB/SC | | Problem | problemes |
|
liste des actions à menées | | |
|
|
25
|
Fri Sep 2 08:51:46 2022 |
MO | | Shift summary | etc |
|
démarrage | | 8h35 mise sous tension: PSS, LB9000,
modulateur, chillers |
|
|
4
|
Thu Jul 16 09:50:37 2020 |
Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020 | Under Process | Info | etc |
|
demarrage à blanc | | debut du démarrage à blanc
9h45. Démarrage prévu par étape. |
|
|
6
|
Thu Dec 3 10:58:11 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020 | Fixed | Info | docs |
|
demarrage a blanc 3 dec 2020 | | Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)
but : verification etat IHM pour |
|
|
14
|
Wed Mar 3 10:49:14 2021 |
Hayg | Under Process | Info | problemes |
|
WC tests TANGO | |
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean
Dans les variables MeanStd :
Charge 1 :
er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean
Charge |
|
|
46
|
Thu Feb 9 12:16:41 2023 |
ND | New Solution | Info | Prise de donnees |
|
Verification variables pour l'anneau | | L'IHM de verification des variables
pour l'anneau a ete mis a jour.
Il est accessible dans plateforme |
|
|
16
|
Thu Mar 4 16:36:12 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021 | Under Process | Shift summary | Prise de donnees |
|
Tests IHM RF | | De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla) |
|
|
21
|
Thu Mar 4 17:07:32 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021 | Under Process | Shift summary | Prise de donnees |
|
Tests IHM RF | | Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés. |
|
|
37
|
Mon Oct 17 10:02:07 2022 |
VK, IC, VI, JH, SC, ND | Reference Solution | Info | resumes |
|
Summary of the ring commissioning meeting #5 | | See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/
Pb with BPM => visual check |
|