HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Controle commande TANGO IHM CC ELLIOOS
  Notes concernant le CC ELLIOOS  Not logged in ThomX    logo
Message ID: 2     Entry time: Thu Jul 8 09:38:05 2021
 Author: Entered by Aurelien Martens from 134.158.88.183 on Thu Jul 8 09:37:52 2021 
 Status: Fixed 
 Type: Problem 
 Category: Tango | Soft 
 Important:
 Subject: Photocathode laser DS back operational 
 Icon:  

on the 23rd of april the CC of the photocathode was re-installed by Amplitude, along with spare machines.

It was noted on the 25th of June that the laser-amplitude DS was not pushing informations. The problem certainly was present since a very long time.

Following a careful check of database file of the system (located in Data/28xxxx/) it was realized that the laser-amplitude.db file was missing.

Scarell (under Amplitude request) interveaned via teamviewer yesterday and put back the system operationnal. The laser-amplitude DS was checked it is fonctionnal with jive.

NB: in order to let the embedded machine access the internet (teamviewer...), it was needed to put it in DHCP mode, old (manual IP) and new configurations attached.

 

Attachment 1: IMG_4777.jpg  1.245 MB  Uploaded Thu Jul 8 10:55:52 2021  | Hide | Hide all
IMG_4777.jpg
Attachment 2: IMG_4780.jpg  1.355 MB  Uploaded Thu Jul 8 10:56:17 2021  | Hide | Hide all
IMG_4780.jpg
ELOG V3.1.4-395e101