13 Entries
ID
Date
Author
Status
Type
Category
Location
Title
Text
9
Thu Apr 27 11:52:38 2023
Manar Amer
Fixed
info
lasers and optics
ThomX igloo
Replacement Fiber for Amplifier
The fiber replacement has arrived for the
amplifier.
This fiber connects the head of
10
Mon May 22 15:37:38 2023
Manar Amer
Fixed
info
lasers and optics
ThomX igloo
Replacement Fiber for Amplifier
2 weeks ago, Daniele changed the fiber
connecting the amplifier box to the controller
rack.
6
Thu Dec 1 13:53:54 2022
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
Optical lenses for the telescope
attached is the order for the telescope
spherical optical lenses
7
Wed Mar 15 18:13:19 2023
Manar Amer
Fixed
report
lasers and optics
ThomX igloo
New Mirrors from LMA
Today New 16 mirrors arrived from LAM of
2 sets of 8
8 for KBox , 8 for ThomX.
4
Tue Oct 12 16:57:48 2021
Manar Amer
Fixed
info
utilities
ThomX igloo
Laser Safety Glasses LG1
3
safety glasses for ThomX cavity
LG1
8
Tue Mar 28 14:05:06 2023
Manar Amer
Fixed
report
lasers and optics
Other
Focal changing lens
a focal changing lens was ordered for the
telescope of ThomX to factor into account
the change in divergence with power.
11
Mon May 22 16:14:53 2023
Manar Amer
Fixed
report
lasers and optics
Other
Focal changing lens
The 2 lenses are to be tested in PLIC room.
We currently have one controller
for one of the lenses, Daniele is ordering
13
Mon Jun 19 15:34:56 2023
Manar Amer
Fixed
report
lasers and optics
Other
Focal changing lens
We are able to connect the pc soft to the
lens and control its vergence and measure
the value of the vergence using a method
5
Tue Apr 5 17:58:48 2022
Manar Amer
Fixed
report
utilities
ThomX igloo
Fan Filter Unit
The Clean Air Flow filtering unit installed.
The prefilters have not been changed
since installation, an order for a new set
1
Tue Nov 6 10:54:16 2018
Ronic Chiche
Fixed
info
detectors and electronics
Optical room
Electronics and opto-electronics devices to be ordered
Electronics devices to be ordered :
x3 Power supplies (2x 0-30 / 5A)
: 3x 333€ = 1k€
2
Thu Nov 15 12:55:35 2018
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Beam viewer
InfraRed beam viewer ordered by Viktor.
12
Mon Jun 19 15:30:19 2023
Manar Amer
Fixed
info
lasers and optics
Other
33.33 & 133.33 MHz oscillator data sheet
Adding the data sheet of both one five
oscillators
133.33 is from 2017
3
Fri Dec 18 16:01:48 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
133.33 MHz Onefive received
133.33 MHz Onefive left switzerland on
15th of december and arrived on 16th.