HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 24 of 24  Not logged in ELOG logo
Entry   Power shut down on August 29th, posted by Ronic Chiche at ThomX igloo about detectors and electronics 
    Reply   Power shut down on August 29th, posted by Ronic Chiche at ThomX igloo about detectors and electronics 
Entry   Electrical trouble (disjunction), posted by Loïc Amoudry at Optical room about cabling 
ELOG V3.1.4-395e101