ID Date Author Status Type Categorydown Location Title Text Attachments
  449   Wed Aug 27 12:01:41 2025 Ronic ChicheFixedinfodetectors and electronicsThomX iglooPower shut down on August 29thThis morning, all the equipments have been
switched off due to a power shut down
tomorrow morning.
  
  450   Thu Aug 28 18:01:46 2025 Ronic ChicheFixedinfodetectors and electronicsThomX iglooPower shut down on August 29thafter alignment, CEP adjustment and optimizing
the PDH phase, I got back ~92kW in the FPC
for 33% amplifier ratio.
  
  66   Thu Oct 3 14:00:13 2019 Loïc AmoudryFixedissuecablingOptical roomElectrical trouble (disjunction)The circuit breaker on ThomX cavity drops
@1.5-1.8kW when we turn on 1/2nd
stage of the amplifier or 3rd stage of the
  
ELOG V3.1.4-395e101