HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 21 of 24  Not logged in ELOG logo
ID Date Author Status Type Category Location Titledown Text Attachments
  189   Thu Feb 23 10:15:30 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurement
Yesterday,
Guillaume Machinet and Vincent Clet from
Alphanov came to fixe some issues with the
  
  190   Mon Feb 27 18:23:13 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Victor we took a reading
of the beam profile using a 400 mm lens
at 70 % and 100 % amplification.
 WhatsApp_Image_2023-02-27_at_6.07.00_PM.jpeg 
  191   Wed Mar 8 14:49:12 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementthis morning with Manar,
we checked the Alphanov amplifier
issue : "The laser has been stopped
 20230308_124313.jpg 
  194   Mon Mar 13 16:10:24 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementWe took reading of the beam profile of
the amplifier without a lens @ 30 cm from
the 2nd wedge for amplification percentages
 Beam_wavefront_30cm_no_Lens.jpg 
  202   Mon Mar 20 17:55:25 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementdue to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the
  
  178   Mon Jan 9 14:03:16 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAlphanov amplifier beam profile Data Adding the schematic of the measurements.,

the 4°
Beam Deviation, AR Coating ( B coating)
 8x 
  183   Mon Jan 30 17:40:10 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAlphanov amplifier beam profile Data This Morning with Victor the amplifier
was turned on @ 20% amplification (output
~ 9 W ) for approximately 3 hours and no
  
  144   Fri Apr 8 13:34:54 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationThe pulse duration from the amplifier compressor
output will be measured using PulseCheck
autocorelator
 pulse-check_compressed.pdf 
  145   Fri Apr 8 19:24:32 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationMeasurement of the pulse was done at the
end of the afternoon, Pulse Duration
FWHM = 12.9 ps
 20220401_Alphanov_Pulse_Duration.jpg20220408_AMplifier_133MHz_Pulse_duration.jpg20220408_AMplifier_133MHz_Pulse_duration_better_alignment.jpg 
  146   Fri Apr 8 19:25:16 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationPulse Duration FWHM = 12.9 ps




  
  135   Tue Mar 22 21:19:48 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday: Manar, Ronic and Aurlien started
the study of the beam profile of the alphanov
amplifier at high power.
 8x 
  136   Tue Mar 22 21:20:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Profile 




  
  137   Wed Mar 23 13:55:11 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileAdding the fitted beam in 1D in Horizontal
and vertical axis.

for 10%   to  60%
 6x 
  138   Fri Apr 1 23:59:51 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday a second reading of the beam profile
was done , with Victor ,Ronic, Aurlien and
Manar
  
  139   Sat Apr 2 00:45:25 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileReadings of the beam shape and horizontal
(upper plot) and vertical (lower plot) axis
fit at the direct output of the amplifier.
 9x 
  140   Sat Apr 2 00:51:07 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileReadings of the beam shape and fit at the
output of the compressor

differance from
 20220401_Alphanov_Beam_setup_after_compressor.jpg20220401_Amplifier_AfterCompressor_50perc_133MHz.bmp20220401_Amplifier_AfterCompressor_60perc_133MHz.bmp20220401_Amplifier_AfterCompressor_50perc_133MHz_BeamFit.png20220401_Amplifier_AfterCompressor_60perc_133MHz_BeamFit.png 
  141   Mon Apr 4 14:23:14 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileAdding the readings  20% , 30% , 
40%  for output of amplifier after the
compressor
 6x 
  142   Fri Apr 8 13:12:34 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileThis Morning, another reading was taken
for the output of the amplifier after the
compressor using 2 wedge mirrors.
 12x 
  147   Fri Apr 15 19:00:20 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileVictor, Ronic, Manar

Today  was dedicated to the
study of the CVBG, and it's effect on
 20x 
  148   Tue Apr 19 12:15:43 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileFor better comparison ,

the measurements done previously
with 2 CVBGs was done at ~ 30 cm and the
 8x 
ELOG V3.1.4-395e101