  Status of commissioning, report also here plots are reports., Page 20 of 24  Not logged in ELOG logo
ID Date Author Statusdown Type Category Location Title Text Attachments
  330   Mon Mar 4 18:32:21 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser and FP cavities frequency adjustmentThis afternoon, I did the 2nd half of the
travel: dF @ 33MHz = 0Hz
=> the Smaract motor position is
  
  331   Tue Mar 5 11:20:43 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning, I finished the FP-cavity
alignment with the new ring RF frequency.
I get back 50kW @ 33% amplifier ratio.
 Correct_lock_parameters.png 
  332   Tue Mar 19 13:01:22 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationThis morning with Daniele, we operated
the FP-cavity to be sure there is no issue
due to the Linac section changing operation
  
  333   Tue Mar 26 10:20:54 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationThis morning, I locked again the FP-cavity
at more than 50kW with 33% of laser amplifier
ratio.
  
  334   Tue Apr 2 08:51:21 2024 Ronic ChicheFixedinfolasers and opticsThomX iglooNew multiplication factor for the Fabry-Perot intra-cavity powerlast week, we measured the transmission
of a plan mirror from the same batch than
the ThomX mirrors and we got ~ 1.75ppm instead
  
  335   Tue Apr 2 09:19:31 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationfrom now on, the transmission factor for
calculating the FP intra cavity power is
1/1.75ppm ~ 570 000 (changed in the Powermeter
  
  336   Tue Apr 9 09:38:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthis morning, I had to restart the chiller.
Temp Amp 1 is at 27.5°C after having
started the amplifier at 33% ratio.
  
  337   Thu Apr 11 09:58:10 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthis morning, the computer was restarted
and I had to launch all the applications.
no problem except the powermeter for
 Capture.JPG 
  338   Thu Apr 25 09:09:49 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operation

this morning, the chiller was in
error and I had to restart it.
  
  339   Tue May 14 09:20:27 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationYesterday, the ThomX water circuit should
have been repared,
and yesterday aftenoon, Daniele restarted
  
  340   Tue May 14 10:37:41 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthe air temperature is between 21°C
and 22°C.

I tried to lock the cavity but
 Capture.JPG 
  341   Tue May 28 15:05:46 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday, I tried to restart the amplifier
at 0% (without 3rd stage) but it didn't
start... still the same error message.
  
  342   Fri May 31 18:12:59 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday with Daniele, we disconnected the
EOM to increase the injected power of the
amplifier, we were at 4.8mW but we still
  
  343   Thu Jun 6 09:17:02 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueFYI : to access special menus on the Alphanov
software,

login : "Administrator"
  
  344   Wed Jun 19 09:07:56 2024 Ronic ChicheFixedinfosoftwareThomX iglooNew password for login on the ThomX computerthe previous password has expired.

the new access from the computer
:
  
  345   Wed Jun 19 09:14:14 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issuethe present situation is :

Guillaume asked me to disconnect
the "Laser head" cable from the
  
  346   Mon Jul 22 09:54:24 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueGuillaume and Julien Bour from Alphanov
will come on wednesday 24/07 to have a first
look and check the amplifier.
  
  347   Tue Jul 23 09:37:24 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issuepicture of the connectors used to carry
signals between the amplifier pump module
and the rack under the table.
 connecteur_laser_head_sur_module_pompes_ampli.jpgconnecteur_laser_head_sur_chassis_ampli.jpg 
  348   Tue Aug 27 09:59:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuetemperature in the casemate ~ 19.5°C
stable

this morning, I measured the power
 Capture.JPGCapture2.JPG 
  349   Tue Aug 27 10:19:08 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueI refilled the chiller and the stabilized
temperature is @ 25°C

we started the 3rd stage of the
 Capture.JPG 