ID Date Author Status Type Category Location Title Text Attachments
  136   Tue Mar 22 21:20:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Profile 




  
  135   Tue Mar 22 21:19:48 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday: Manar, Ronic and Aurlien started
the study of the beam profile of the alphanov
amplifier at high power.
 8x 
  134   Fri Mar 18 15:04:30 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier power measurementanswers from Guillaume:

- the chiller temperature has to
be set to 25°C
  
  133   Fri Mar 18 11:48:14 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier power measurementThis morning, with Manar and Aurélien,
we measure the power directly at
the output of the Alphanov amplifier with
 power_after_compressor_vs_current_for_133MHz_laser.png 
  132   Mon Mar 14 18:39:40 2022 Manar AmerFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooCurrent Installed SetupAttached is the current setup in ThomX  18-02-2022_ThomX_FPCavity_Finesse_Setup.jpg 
  131   Fri Mar 11 17:58:24 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAdditional information related to the injected
power into the amplifier fibers.

power = 4.45 mW (as shown from
  
  130   Fri Mar 11 17:33:33 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAurélien, Manar, and I spent more
than 2h trying to start the software communicating
with the Alphanov amplifier controller.
  
  129   Fri Mar 11 12:59:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooCavity beam Image Updated beam image after change on the
mode axis.

Taken after P4.
 Capture.PNGCapture2.PNG 
  128   Fri Mar 11 12:46:58 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity mode axis change and Finesse measurementthis morning with Manar, we did a cavity
mode axis change.

we checked the cavity mode centroid
  
  127   Fri Feb 4 10:59:56 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment one thing which could reduce the Finesse
is the L-shape metal piece if it is slightly
inserted in the FP-cavity mode path.
 apercu_03.jpgBras_manipulateur.jpg 
  126   Thu Feb 3 19:01:04 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment

After changing the way of injecting
modulation for PDH and modulation for FSR
 Finesse_Fit.png 
  125   Thu Feb 3 18:59:10 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment

to measure the Finesse, instead
of having 2x EOM for the PDH and for the
  
  123   Thu Feb 3 18:40:04 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment The fluctuation problem has been solved.
It was simply the new scheme to inject
2 RF frequencies in a single EOM.
  
  121   Thu Feb 3 14:11:50 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment This morning, me and Ronic managed to obtain
the FSR and image of the finesse which is
to be analyzed.
 6x 
  120   Thu Feb 3 14:10:08 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment As it can be seen on the first plot, even
with a good locking (good reduction of "high"
frequencies noise: we had better locking
  
  119   Thu Feb 3 13:56:24 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Ending alignment series !!




  
  118   Wed Feb 2 11:41:01 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Adding Oscilloscope images


delocked + locked intervals
showing the 20% coupling
lock
 tek0003.pngtek0006.pngtek0007.png 
  117   Wed Feb 2 11:22:51 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment This morning with Manar, we installed the
AOM+RF amplifier and the associated fast
feedback loop.
  
  116   Tue Feb 1 16:40:06 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment This afternoon, I did some alignment of
the injection mirrors with a fast scan on
the LaseLock to get a regular transmission
  
  115   Tue Feb 1 14:17:02 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Installed and inputs: 


CW laser ; power = 101
mW
PDH ;

at output

Low
 ThomX_FP_setup_01-02-2022.pngtek0002.png 