    Reply   Fast feedback loop between laser and FP cavity, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
Entry   some changes in the feedback scheme, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics Capture.PNG20231108_154711.jpg
Entry   33MHz (FP-cavity vs RF) phase stability, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   33MHz (FP-cavity vs RF) phase stability, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
Entry   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics Capture.JPG
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics Capture.JPG
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
Entry   fixing CVBG issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   fixing CVBG issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 12x
    Reply   fixing CVBG issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 20240906_151100.jpg
Entry   Checking the amplifier power, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   Checking the amplifier power, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
    Reply   Checking the amplifier power, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 