Status of commissioning, report also here plots are reports., Page 4 of 13
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
260 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
11
,
12
,
13
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
45
Thu Dec 19 16:23:39 2019
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Cavity beam axis moving with power
how the cavity beam axis is moving during
a lock when the cavity is hot ?
could it explain a part of the Transmission
9x
46
Thu Jan 9 16:54:05 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Microscope and cleaning of SBOX mirrors
The mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then
47
Fri Jan 10 18:51:23 2020
Ronic Chiche
Fixed
report
lasers and optics
Optical room
analysis of stored and reflected power
the 10th of January, we increased the power
of the amplifier to study the cavity transmitted
and reflected power signals.
6x
48
Fri Jan 24 16:16:24 2020
Ronic Chiche
Fixed
report
lasers and optics
Optical room
analysis of stored and reflected power
A chart which summarizes
the data we have or we can estimate.
49
Fri Jan 24 17:52:14 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
AFM analysis of M1
AFM has been proceeded on M1 and M2.
The pdf shows the first images
taken with the PLIC room Leica microscope
50
Fri Jan 24 17:56:11 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
AFM analysis of M2
We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror.
51
Fri Jan 24 17:58:45 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
CFBG removed from ThomX CELIA amplifier
The CFBG has been removed successfully
and the amplifier is closed now.
The soldering machine had a calibration
52
Wed Jan 29 19:00:02 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Glow discharge cleaner on SBOX mirrors
The glow discharge cleaner has been tested
on the SBOX mirrors.
I've put them 1 by 1. Each
53
Wed Jan 29 19:04:38 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
SBOX mirrors cleaned
Today, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before.
54
Wed Feb 5 14:47:16 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
SBOX mirrors cleaned
Yesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with
55
Wed Feb 5 16:46:01 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
SBOX mirrors cleaned
Today we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique.
56
Thu Feb 6 11:01:08 2020
Ronic Chiche
Fixed
report
lasers and optics
Optical room
analysis of stored and reflected power
with this Finesse around 22-23k, the technique
comparing TRANSMISSION and REFLECTION signals
doesn't work, even in taking into account
57
Thu Feb 6 16:58:57 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Power up to 48kW crater effect again
As we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater).
60
Wed Dec 16 12:36:37 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Mirror's cleaning and microscope imaging
On 10th of december 2020 we cleaned the
SBOX mirrors and took microscope images
(the name of the images indicates what they
14x
61
Tue Jan 5 12:38:04 2021
Manar Amer
Fixed
report
lasers and optics
Optical room
Transmission Measurements for the Mirrors.
Thursday 10 December 2020:
First Test Measurement - Inside Box
The
transmission ( T ) for the mirrors of SBOX
6x
62
Tue Jan 12 10:44:57 2021
Ronic Chiche
Fixed
issue
lasers and optics
Optical room
Origami SN2440 133MHz laser power measurment... and failure
we received from NKT the Origami SN2440
133MHz oscillator from repair on 2020/12/17
and we measured the power trend from
63
Thu Jun 10 17:55:15 2021
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Origami SN2440 133MHz laser tests
Today, we received the Origami SN2440 133MHz
oscillator from repair (NKT mentioned a defective
wire inside the controller....)
64
Mon Jul 5 14:14:01 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
We started measuring the phase
noise on the OEwaves CW laser.
Class
3b
wavelength 1.5 um
The
65
Mon Jul 5 14:40:57 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
a correction on the wavelength of the laser
it is 1030 um
66
Mon Jul 5 14:46:44 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
correction on unit 1030 nm
Goto page
Previous
1
,
2
,
3
, 4,
5
...
11
,
12
,
13
Next
All