Status of commissioning, report also here plots are reports., Page 4 of 13
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
11
,
12
,
13
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
61
Tue Jan 5 12:38:04 2021
Manar Amer
Fixed
report
lasers and optics
Optical room
Transmission Measurements for the Mirrors.
Thursday 10 December 2020:
First Test Measurement - Inside Box
The
transmission ( T ) for the mirrors of SBOX
6x
62
Tue Jan 12 10:44:57 2021
Ronic Chiche
Fixed
issue
lasers and optics
Optical room
Origami SN2440 133MHz laser power measurment... and failure
we received from NKT the Origami SN2440
133MHz oscillator from repair on 2020/12/17
and we measured the power trend from
63
Thu Jun 10 17:55:15 2021
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Origami SN2440 133MHz laser tests
Today, we received the Origami SN2440 133MHz
oscillator from repair (NKT mentioned a defective
wire inside the controller....)
64
Mon Jul 5 14:14:01 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
We started measuring the phase
noise on the OEwaves CW laser.
Class
3b
wavelength 1.5 um
The
65
Mon Jul 5 14:40:57 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
a correction on the wavelength of the laser
it is 1030 um
66
Mon Jul 5 14:46:44 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
correction on unit 1030 nm
67
Wed Mar 23 18:11:22 2022
Manar Amer
Fixed
report
utilities
Optical room
Dust Cleaning of SBox
An Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed.
68
Wed Mar 23 18:17:45 2022
Manar Amer
Fixed
report
utilities
Optical room
Dust Cleaning of SBox
The cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken
69
Tue Mar 29 16:23:00 2022
Manar Amer
Fixed
report
lasers and optics | cabling
Optical room
Mightylaser Amplifier
Migthylaser amplifier has been moved from
the SBox table to the PLIC table.
70
Tue Mar 29 16:27:34 2022
Manar Amer
Fixed
report
utilities
Optical room
Spincoater - Mirrror cleaning
In preparation for cleaning the mirrors.
The spincoater has been moved with
its bump into the sas of the SBox.
71
Wed Mar 30 18:53:01 2022
Manar Amer
Fixed
report
mechanics | lasers and optics | utilities
Optical room
Dust Cleaning of SBox
The inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside.
6x
72
Thu Mar 31 13:29:01 2022
Manar Amer
Fixed
report
mechanics | lasers and optics | utilities
Optical room
Dust Cleaning of SBox
After an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken:
73
Mon Apr 4 13:58:23 2022
Manar Amer
Fixed
issue
detectors and electronics | utilities
Optical room
Clean Airflow Dust measurements
The dust meter cap was cleaned using Alcohol,
and using the filter white cap the dust count
was (0 Av. 10 min)
74
Fri Apr 8 19:27:12 2022
Manar Amer
Fixed
issue
detectors and electronics | utilities
Optical room
Clean Airflow Dust measurements
Dust measurement done today on top
of the SBox average 10min
75
Wed Apr 13 18:42:50 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
Used the spincoater and pure water to clean
dielectric mirrors which will be installed
inside the SBox for directing the reflection
76
Wed Apr 20 19:05:37 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
KBox Alignment
Starting with the alignment of the KBox
using CW Koheras.
The size of the CW output from
7x
77
Mon Apr 25 17:28:29 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
SBox alignment, using CW laser Koheras
power 1 mW
6x
78
Mon Apr 25 17:58:01 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
After pointers and Advice from Aurélien,
improvement of the beam alignment
through M1 and M2 irises was done.
79
Mon Apr 25 18:02:09 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Remember to update the position of the
reference Irises tomorrow !!!!
80
Tue Apr 26 20:08:10 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Adjust the placement of
the Irises (done at the start of the
9x