ID Date Author Statusdown Type Category Location Title Text Attachments
  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
  
  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningnow, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
  
  237   Fri Jun 13 20:10:00 2025 Alice RenauxFixedreportlasers and opticsOptical roomDamaged mirrors testToday with Dorian we tested three mirrors
with which we previously haven't been
able to obtain any resonance or optical beating
  
  241   Thu Sep 4 17:35:50 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomInstallation of the avalanche photodiodeAfter installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low
  