  Status of commissioning, report also here plots are reports., Page 13 of 13  Not logged in ELOG logo
Entry   2 mirror cavity high power experiments, posted by Xinyi Lu at Optical room about lasers and optics record_20240425.pngScreenshot_2024-04-25_4_155354-155kw.pngScreenshot_2024-04-25_1_154630-155kw.png60kW_highordermode2.jpg
    Reply   high-power experiments of 2-mirror cavity, posted by Xinyi Lu at Optical room about lasers and optics record_20240506.pngrecord20240506.xlsxScreenshot_2024-05-06_11_145855-500kW.pngScreenshot_2024-05-06_1_112931-14kW.png
    Reply   high-power experiments of 2-mirror cavity, posted by Xinyi Lu at Optical room about lasers and optics telescope_optimization_for_700kW.pdf2_Mirrors_-_216MHz_-_700kW_cavity_setup.xmlcavity_2M_dynamic_thermal_effect.m
    Reply   high-power experiments of 2-mirror cavity, posted by Xinyi Lu at Optical room about lasers and optics 6x
    Reply   D-shape mirrors positionning status, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 
Entry   Menhir 160MHz laser, posted by Alice Renaux at Optical room about lasers and optics spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png
Entry   optical table cleaning, posted by Ronic Chiche at Optical room about utilities Oxydation.jpg20241203_113105.jpg20241203_125359.jpg
    Reply   optical table cleaning, posted by Ronic Chiche at Optical room about utilities 
    Reply   optical table cleaning, posted by Ronic Chiche at Optical room about utilities 
Entry   Damaged mirrors test, posted by Alice Renaux at Optical room about lasers and optics 
Entry   Installation of the avalanche photodiode, posted by Ronic Chiche at Optical room about lasers and optics | detectors and electronics 