HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports., Page 12 of 13  Not logged in ELOG logo
Entry   M4 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 
    Reply   M4 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 
    Reply   M1 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 
Entry   First run with spare mirrors, posted by Loïc Amoudry at Optical room about lasers and optics Plot_power_and_gain_vs_all.JPGpowerup.xlsx
Entry   Mirrors cleaning, posted by Loïc Amoudry at Optical room about lasers and optics 
Entry   Mirrors features, come back from LMA, posted by Loïc Amoudry at Optical room about lasers and optics 181201_caracteristiques_miroirs.PNG20181207_155704_resized.jpg20181207_155726_resized.jpg
Entry   Deposit on S-box mirrors after return from LMA, posted by Loïc Amoudry at Optical room about lasers and optics 28_M2ReflectiveBeforeCleaning_compressed.jpg29_M2ReflectiveAfter1stCleanPaper_compressed.jpg
Entry   Impacts on mirror's surface, posted by Loïc Amoudry at Optical room about lasers and optics 18_M1reflectiveface2x_compressed.jpg
Entry   AFM performed on S-BOX mirrors, posted by Loïc Amoudry at Other about lasers and optics Image3.jpgImage4.jpg
Entry   Meeting with LMA people, AFM, posted by Loïc Amoudry at Other about lasers and optics POINT_SUR_LES_MIROIRS.pptx
Entry   AFM+ InfraRed spectroscopy (IR spectro) has been performed, posted by Loïc Amoudry at Other about lasers and optics 191113_AFMetspecIR-miroirs_SBOX.pdf
Entry   Mirror's cleaning, posted by Loïc Amoudry at Optical room about lasers and optics resume_M3.PNGresume_M1_M2_M4.PNG
Entry   Mirror's installed, posted by Loïc Amoudry at Optical room about lasers and optics 
Entry   Microscope and cleaning of SBOX mirrors, posted by Loïc Amoudry at Optical room about lasers and optics resume_nettoyage_apres_sejour_dans_K-BOX_et_montee_en_puissance.PNG
Entry   AFM analysis of M1, posted by Loïc Amoudry at Optical room about lasers and optics 200115_AFM_miroirs.pdf
Entry   AFM analysis of M2, posted by Loïc Amoudry at Optical room about lasers and optics M2.PNG
Entry   CFBG removed from ThomX CELIA amplifier, posted by Loïc Amoudry at Optical room about lasers and optics 
Entry   Glow discharge cleaner on SBOX mirrors, posted by Loïc Amoudry at Optical room about lasers and optics glow.PNG
Entry   SBOX mirrors cleaned, posted by Loïc Amoudry at Optical room about lasers and optics 
    Reply   SBOX mirrors cleaned, posted by Loïc Amoudry at Optical room about lasers and optics 
ELOG V3.1.4-395e101