HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports., Page 12 of 13  Not logged in ELOG logo
    Reply   high-power experiments of 2-mirror cavity, posted by Xinyi Lu at Optical room about lasers and optics 6x
    Reply   D-shape mirrors positionning status, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 
Entry   CELIA 100W laser amplifier repair , posted by Ronic Chiche at Optical room about lasers and optics 
    Reply   CELIA 100W laser amplifier repair , posted by Ronic Chiche at Optical room about lasers and optics IMG20241002144351.jpgIMG20241002144936.jpg20241002_161657.jpgClipboard_10-02-2024_01.jpg
Entry   Menhir 160MHz laser, posted by Alice Renaux at Optical room about lasers and optics spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png
Entry   Menhir 216MHz laser, posted by Alice Renaux at Optical room about lasers and optics spectre.xlsxspectre.png
Entry   optical table cleaning, posted by Ronic Chiche at Optical room about utilities Oxydation.jpg20241203_113105.jpg20241203_125359.jpg
    Reply   optical table cleaning, posted by Ronic Chiche at Optical room about utilities 
    Reply   CELIA 100W laser amplifier repair , posted by Ronic Chiche at Optical room about lasers and optics Sans_titre.png
    Reply   optical table cleaning, posted by Ronic Chiche at Optical room about utilities 
Entry   Alignment of a 2-mirror FP cavity, posted by Ronic Chiche at Optical room about mechanics | lasers and optics 
Entry   2-mirror cavity alignment, posted by Alice Renaux at Optical room about mechanics | lasers and optics 2-mirror_cavity_alignment.zip
Entry   2-mirror cavity alignment, posted by Alice Renaux at Optical room about lasers and optics IMG20250527160111.jpg
    Reply   2-mirror cavity alignment, posted by Alice Renaux at Optical room about lasers and optics Sans_titre.jpg
Entry   2-mirror cavity full setup, posted by Alice Renaux at Optical room about lasers and optics 
Entry   Damaged mirrors test, posted by Alice Renaux at Optical room about lasers and optics 
Entry   first attempt to lock, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 20250623_123816.jpg20250623_123833.jpg20250623_123908.jpg
Entry   2-mirror cavity locking, posted by Alice Renaux at Optical room about lasers and optics Figure_1.pngFigure_2.png
Entry   Successful lock (finally !), posted by Alice Renaux at Optical room about lasers and optics IMG_20250903_113758.jpg
Entry   Installation of the avalanche photodiode, posted by Ronic Chiche at Optical room about lasers and optics | detectors and electronics 
ELOG V3.1.4-395e101