  50   Fri Jan 24 17:56:11 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomAFM analysis of M2We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror.
 M2.PNG 
  49   Fri Jan 24 17:52:14 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomAFM analysis of M1AFM has been proceeded on M1 and M2.

The pdf shows the first images
taken with the PLIC room Leica microscope
 200115_AFM_miroirs.pdf 
  48   Fri Jan 24 16:16:24 2020 Ronic ChicheFixedreportlasers and opticsOptical roomanalysis of stored and reflected powerA chart which summarizes
the data we have or we can estimate.
 Losses.pdfM1_losses_vs_Pcav.png 
  47   Fri Jan 10 18:51:23 2020 Ronic ChicheFixedreportlasers and opticsOptical roomanalysis of stored and reflected powerthe 10th of January, we increased the power
of the amplifier to study the cavity transmitted
and reflected power signals.
 6x 
  46   Thu Jan 9 16:54:05 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomMicroscope and cleaning of SBOX mirrorsThe mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then
 resume_nettoyage_apres_sejour_dans_K-BOX_et_montee_en_puissance.PNG 
  45   Thu Dec 19 16:23:39 2019 Ronic ChicheFixedinfolasers and opticsOptical roomCavity beam axis moving with powerhow the cavity beam axis is moving during
a lock when the cavity is hot ?
could it explain a part of the Transmission
 9x 
  44   Thu Dec 19 16:03:17 2019 Ronic ChicheFixedinfolasers and opticsOptical roomBeam size behind M2Yesterday, we tried to better adapt positions
of the telescope lenses, dynamically, during
the lock, to improve the matching between
  
  42   Thu Dec 19 09:21:45 2019 Ronic ChicheFixedinfolasers and opticsOptical roomOptical amplifier polarization statepolarization state of the cavity at higher
power : 20kW, 30kW  and 33kW (slight
CEP and alignment optimization) :
 cavity_polar_3e_etage_2A_-_20kW.PNGcavity_polar_3e_etage_3A_-_30kW.PNGcavity_polar_3e_etage_3A_-_33kW.PNG 
  41   Tue Dec 17 17:58:12 2019 Ronic ChicheFixedinfolasers and opticsOptical roomBeam size behind M2the telescope matchs the cold cavity beam,
so it is normal to have a power decrease
on the transmission photodiode when the cavity
  
  40   Tue Dec 17 17:54:38 2019 Ronic ChicheFixedinfolasers and opticsOptical roomOptical amplifier polarization stateThe
polarimeter was giving a strange 50% of DOP
of the light coming from the cavity.
 cavity_polar_2e_etage_1kW.PNG 
  39   Tue Dec 17 12:16:54 2019 Ronic ChicheFixedinfolasers and opticsOptical roomOptical amplifier polarization stateWe placed a PBS + 2 photodiodes (PhD1,
PhD2) at the output of the amplifier to check
how the polarization of the amplifier changes
 Screenshot_2019-12-17_8_122311.pngScreenshot_2019-12-17_7_122157.png 
  38   Tue Dec 17 10:56:08 2019 Ronic ChicheFixedreportlasers and opticsOptical roomfirst data with 3A on the 3rd stage2 pictures :

typical beam with HOM

typical beam after moving the D-shape
 HOM_5-3_saturated.pngfundamental_mode_saturated.png 
  37   Tue Dec 17 10:46:24 2019 Ronic ChicheFixedinfolasers and opticsOptical roomBeam size behind M2Beam diameter behind M2 :

- 2nd stage @ 6A - 1kW inside cavity
sx = 2120 µm
 beam_diameter_behind_M2_-_1kW.pngbeam_diameter_behind_M2_-_30kW.png 
  36   Fri Dec 13 18:28:00 2019 Ronic ChicheFixedreportlasers and opticsOptical roomfirst data with 3A on the 3rd stageToday, at 3A on the 3rd stage, we saw some
HOM effects.
the transmissions is about 100mW which
 Screenshot_2019-12-13_3_184235.pngHOM.gif 
  35   Fri Dec 13 15:56:22 2019 Ronic ChicheFixedissuelasers and opticsOptical room2nd stage amplifier issue2nd stage output power was going down.
We checked the pump diode technical data
sheet and the operating temperature is [25°C:35°C].
  
  34   Thu Dec 12 11:49:05 2019 Ronic ChicheFixedissuelasers and opticsOptical room2nd stage amplifier issueLast time, we switched ON directly the
2nd stage at 6A without increasing/decrinsing
slowly the current.
  
  33   Wed Dec 11 17:13:02 2019 Ronic ChicheFixedissuelasers and opticsOptical room2nd stage amplifier issuethe 2nd stage amplifier needed several
hours (4-5h) to reach its nominal power (we
look at photodiode level on a scope), instead
  
  32   Tue Dec 10 09:36:56 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFSR and Finesse measurementYesterday the cavity has been aligned and
locked with the CW Koheras laser.

the FSR has been measured by modulation
 untitled.png 
  31   Fri Dec 6 11:54:58 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's installedThe initial 400kW SBOX mirrors which have
been cleaned ont 28th of november have been
installed this morning on the SBOX.
  
  30   Fri Dec 6 11:53:53 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaningXPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot
 resume_M3.PNGresume_M1_M2_M4.PNG 